Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
21 |
Material Type: Reports
|
A Case Study in Risk/Decision AnalysisAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
22 |
Material Type: Reports
|
Decision Risk Analysis of the Run-Flat Folding Sidewall TireApproved for public release; distribution is unlimited.Digital Resources/Online E-Resources |
|
23 |
Material Type: Reports
|
Decision Risk Analysis for XM204, 105mm Howitzer, Towed Reliability/ Durability RequirementsApproved for public release; distribution is unlimited.Digital Resources/Online E-Resources |
|
24 |
Material Type: Reports
|
Evaluation of Automatic Transmissions for Use in Military Wheeled Vehicles (Decision Risk Analysis)Approved for public release; distribution is unlimited.Digital Resources/Online E-Resources |
|
25 |
Material Type: Reports
|
Risk Analysis of the Supply-Handling Conveyor SystemAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
26 |
Material Type: Reports
|
Remotely Monitored Battlefield Sensor System (REMBASS) Program Decision Risk AnalysisAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
27 |
Material Type: Reports
|
Small Caliber Ammunition Modernization Program Evaluation and Review (SCAMPER): A Contrast in TechniquesAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
28 |
Material Type: Reports
|
Radar Hardware Second Buy Decision Risk AnalysisAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
29 |
Material Type: Reports
|
Performance Risk Analysis for a Surface Attack Guided Missile System (SAGUMS)APPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
30 |
Material Type: Reports
|
Platoon Early Warning Device (PEWD) Decision Risk Analysis (DRA)APPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
31 |
Material Type: Reports
|
An Impact Assessment Algorithm for R&D Project Risk AnalysisAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
32 |
Material Type: Article
|
A benefit/risk analysis of the Betacel battery nuclear powered cardiac pacemakerBiomedizinische Technik, 1973, Vol.18 (s1), p.179-186 [Peer Reviewed Journal]ISSN: 0013-5585 ;EISSN: 1862-278X ;DOI: 10.1515/bmte.1973.18.s1.179Full text available |
|
33 |
Material Type: Reports
|
Decision Risk Analysis of the An/TSQ-73APPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
34 |
Material Type: Reports
|
Decision Risk Analysis for the Digital Data Link (DDL) ProgramAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
35 |
Material Type: Reports
|
Heavy Equipment Tractor (Decision Risk Analysis)APPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
36 |
Material Type: Reports
|
Geological and Seismological Factors for Design Earthquakes, Patoka Damsite, IndianaAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
37 |
Material Type: Reports
|
Compendium on Risk Analysis TechniquesApproved for public release; distribution is unlimited.Digital Resources/Online E-Resources |
|
38 |
Material Type: Article
|
Inequalities with application in economic risk analysisJournal of applied probability, 1972-06, Vol.9 (2), p.441-444 [Peer Reviewed Journal]Copyright © Applied Probability Trust 1972 ;Copyright 1972 Applied Probability Trust ;ISSN: 0021-9002 ;EISSN: 1475-6072 ;DOI: 10.2307/3212814Digital Resources/Online E-Resources |
|
39 |
Material Type: Reports
|
A Risk Analysis of the Improved Cobra Armament ProgramAPPROVED FOR PUBLIC RELEASEDigital Resources/Online E-Resources |
|
40 |
Material Type: Reports
|
Proceedings of the United States Army Operations Research Symposium (11th), Held at Army Research Office, Durham, North Carolina, on 15-18 May 1972Approved for public release; distribution is unlimited.Digital Resources/Online E-Resources |