skip to main content
Language:
Search Limited to: Search Limited to: Resource type Show Results with: Show Results with: Search type Index

Results 1 - 20 of 794  for All Library Resources

Results 1 2 3 4 5 next page
Show only
Refined by: subject: Construction Contracts remove
Result Number Material Type Add to My Shelf Action Record Details and Options
1
Forecasting Liquidated Damages via Machine Learning-Based Modified Regression Models for Highway Construction Projects
Material Type:
Article
Add to My Research

Forecasting Liquidated Damages via Machine Learning-Based Modified Regression Models for Highway Construction Projects

Sustainability, 2022-05, Vol.14 (10), p.5835 [Peer Reviewed Journal]

2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2071-1050 ;EISSN: 2071-1050 ;DOI: 10.3390/su14105835

Full text available

2
Delay Causes and Types in Nigerian Power Construction Projects
Material Type:
Article
Add to My Research

Delay Causes and Types in Nigerian Power Construction Projects

Energies (Basel), 2022-02, Vol.15 (3), p.814 [Peer Reviewed Journal]

2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 1996-1073 ;EISSN: 1996-1073 ;DOI: 10.3390/en15030814

Full text available

3
Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
Material Type:
Article
Add to My Research

Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia

Journal of engineering (Cairo, Egypt), 2022, Vol.2022, p.1-14 [Peer Reviewed Journal]

Copyright © 2022 Adamu Beyene Negesa. ;Copyright © 2022 Adamu Beyene Negesa. This is an open access article distributed under the Creative Commons Attribution License (the “License”), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. https://creativecommons.org/licenses/by/4.0 ;ISSN: 2314-4904 ;ISSN: 2314-4912 ;EISSN: 2314-4912 ;DOI: 10.1155/2022/8479064

Full text available

4
A study of delays in indian road construction projects under different contracts
Material Type:
Article
Add to My Research

A study of delays in indian road construction projects under different contracts

I-Manager's Journal on Structural Engineering, 2023-04, Vol.12 (1), p.34

2023 i-manager publications. All rights reserved. ;ISSN: 2278-7887 ;EISSN: 2320-2343 ;DOI: 10.26634/jste.12.1.19974

Full text available

5
Partial Least Squares Structural Equation Modeling of Constraint Factors Affecting Project Performance in the Egyptian Building Industry
Material Type:
Article
Add to My Research

Partial Least Squares Structural Equation Modeling of Constraint Factors Affecting Project Performance in the Egyptian Building Industry

Mathematics (Basel), 2023-01, Vol.11 (3), p.497 [Peer Reviewed Journal]

COPYRIGHT 2023 MDPI AG ;2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2227-7390 ;EISSN: 2227-7390 ;DOI: 10.3390/math11030497

Full text available

6
Artificial Neural Network Model to Predict Final Construction Contract Duration
Material Type:
Article
Add to My Research

Artificial Neural Network Model to Predict Final Construction Contract Duration

Applied sciences, 2023-07, Vol.13 (14), p.8078 [Peer Reviewed Journal]

COPYRIGHT 2023 MDPI AG ;2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2076-3417 ;EISSN: 2076-3417 ;DOI: 10.3390/app13148078

Full text available

7
Possession of Site: Another Layer of Complexity in Road Construction
Material Type:
Article
Add to My Research

Possession of Site: Another Layer of Complexity in Road Construction

Sustainability, 2022-06, Vol.14 (11), p.6809 [Peer Reviewed Journal]

COPYRIGHT 2022 MDPI AG ;2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2071-1050 ;EISSN: 2071-1050 ;DOI: 10.3390/su14116809

Full text available

8
Bridging the gap between emerging and established contractors
Material Type:
Article
Add to My Research

Bridging the gap between emerging and established contractors

Civil Engineering : Magazine of the South African Institution of Civil Engineering, 2022-03, Vol.30 (2), p.22-24

Copyright The South African Institution of Civil Engineers Mar 2022 ;ISSN: 1021-2000 ;DOI: 10.10520/ejc-civeng_v30_n2_a8

Full text available

9
Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation
Material Type:
Article
Add to My Research

Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation

Buildings (Basel), 2022-11, Vol.12 (11), p.2028 [Peer Reviewed Journal]

2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2075-5309 ;EISSN: 2075-5309 ;DOI: 10.3390/buildings12112028

Full text available

10
Development of a Taxonomy for Causes of Changes in Construction Projects
Material Type:
Article
Add to My Research

Development of a Taxonomy for Causes of Changes in Construction Projects

Buildings (Basel), 2024-01, Vol.14 (1), p.278 [Peer Reviewed Journal]

COPYRIGHT 2024 MDPI AG ;2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2075-5309 ;EISSN: 2075-5309 ;DOI: 10.3390/buildings14010278

Full text available

11
Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective
Material Type:
Article
Add to My Research

Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective

Journal of engineering, design and technology, 2019-08, Vol.18 (2), p.326-342 [Peer Reviewed Journal]

Emerald Publishing Limited 2019 ;ISSN: 1726-0531 ;EISSN: 1758-8901 ;DOI: 10.1108/JEDT-05-2019-0121

Full text available

12
Rumdel, AfriSam forge ahead on major high-spec N3 contract
Material Type:
Article
Add to My Research

Rumdel, AfriSam forge ahead on major high-spec N3 contract

Civil Engineering : Magazine of the South African Institution of Civil Engineering, 2022-09, Vol.30 (8), p.4-6

Copyright The South African Institution of Civil Engineers Sep 2022 ;ISSN: 1021-2000 ;DOI: 10.10520/ejc-civeng_v30_n8_a2

Full text available

13
Identifying and prioritizing delay factors in Iran’s oil construction projects
Material Type:
Article
Add to My Research

Identifying and prioritizing delay factors in Iran’s oil construction projects

International journal of energy sector management, 2021-05, Vol.15 (3), p.476-495 [Peer Reviewed Journal]

Emerald Publishing Limited ;Emerald Publishing Limited 2020 ;ISSN: 1750-6220 ;EISSN: 1750-6239 ;DOI: 10.1108/IJESM-04-2020-0006

Full text available

14
Risk Management in Public-Private Partnerships
Material Type:
Article
Add to My Research

Risk Management in Public-Private Partnerships

Australian accounting review, 2015-03, Vol.25 (1), p.13-27 [Peer Reviewed Journal]

2015 CPA Australia ;Copyright Australian Society of Certified Practising Accountants Mar 2015 ;ISSN: 1035-6908 ;EISSN: 1835-2561 ;DOI: 10.1111/auar.12062

Full text available

15
Developing a tailored RBS linking to BIM for risk management of bridge projects
Material Type:
Article
Add to My Research

Developing a tailored RBS linking to BIM for risk management of bridge projects

Engineering, construction, and architectural management, 2016-11, Vol.23 (6), p.727-750 [Peer Reviewed Journal]

Emerald Group Publishing Limited ;Emerald Group Publishing Limited 2016 ;ISSN: 0969-9988 ;EISSN: 1365-232X ;DOI: 10.1108/ECAM-01-2016-0009

Full text available

16
7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying
Material Type:
Article
Add to My Research

7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying

Applied sciences, 2022-01, Vol.12 (2), p.844 [Peer Reviewed Journal]

2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2076-3417 ;EISSN: 2076-3417 ;DOI: 10.3390/app12020844

Full text available

17
Assessment of delay and cost-overrun in federal road construction project in Abuja
Material Type:
Article
Add to My Research

Assessment of delay and cost-overrun in federal road construction project in Abuja

Independent Journal of Management & Production, 2020-07, Vol.11 (4), p.1184-1200

Copyright Independent Journal of Management & Production, I J M & P Jul/Aug 2020 ;LICENCIA DE USO: Los documentos a texto completo incluidos en Dialnet son de acceso libre y propiedad de sus autores y/o editores. Por tanto, cualquier acto de reproducción, distribución, comunicación pública y/o transformación total o parcial requiere el consentimiento expreso y escrito de aquéllos. Cualquier enlace al texto completo de estos documentos deberá hacerse a través de la URL oficial de éstos en Dialnet. Más información: https://dialnet.unirioja.es/info/derechosOAI | INTELLECTUAL PROPERTY RIGHTS STATEMENT: Full text documents hosted by Dialnet are protected by copyright and/or related rights. This digital object is accessible without charge, but its use is subject to the licensing conditions set by its authors or editors. Unless expressly stated otherwise in the licensing conditions, you are free to linking, browsing, printing and making a copy for your own personal purposes. All other acts of reproduction and communication to the public are subject to the licensing conditions expressed by editors and authors and require consent from them. Any link to this document should be made using its official URL in Dialnet. More info: https://dialnet.unirioja.es/info/derechosOAI ;ISSN: 2236-269X ;EISSN: 2236-269X ;DOI: 10.14807/ijmp.v11i4.1065

Full text available

18
Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: a systems thinking modelling approach
Material Type:
Article
Add to My Research

Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: a systems thinking modelling approach

Journal of financial management of property and construction, 2022-02, Vol.27 (1), p.29-56 [Peer Reviewed Journal]

Emerald Publishing Limited ;Emerald Publishing Limited. ;ISSN: 1366-4387 ;EISSN: 1759-8443 ;DOI: 10.1108/JFMPC-07-2020-0051

Full text available

19
Application of Game Theory to Conflict Management in a Construction Contract
Material Type:
Article
Add to My Research

Application of Game Theory to Conflict Management in a Construction Contract

Sustainability, 2019-04, Vol.11 (7), p.1983 [Peer Reviewed Journal]

2019. This work is licensed under https://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2071-1050 ;EISSN: 2071-1050 ;DOI: 10.3390/su11071983

Full text available

20
Sustainable Risk Assessment through the Analysis of Financial Losses from Third-Party Damage in Bridge Construction
Material Type:
Article
Add to My Research

Sustainable Risk Assessment through the Analysis of Financial Losses from Third-Party Damage in Bridge Construction

Sustainability, 2020-04, Vol.12 (8), p.3435 [Peer Reviewed Journal]

2020. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2071-1050 ;EISSN: 2071-1050 ;DOI: 10.3390/su12083435

Full text available

Results 1 - 20 of 794  for All Library Resources

Results 1 2 3 4 5 next page

Personalize your results

  1. Edit

Refine Search Results

Expand My Results

  1.   

Show only

  1. Peer-reviewed Journals (46)

Refine My Results

Creation Date 

From To
  1. Before 1990  (11)
  2. 1990 To 1997  (54)
  3. 1998 To 2005  (217)
  4. 2006 To 2014  (435)
  5. After 2014  (78)
  6. More options open sub menu

Language 

  1. Japanese  (2)
  2. Portuguese  (1)
  3. More options open sub menu

Searching Remote Databases, Please Wait