Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Article
|
Biosorptive uptake of Fe(2+), Cu(2+) and As(5+) by activated biochar derived from Colocasia esculenta: Isotherm, kinetics, thermodynamics, and cost estimationJournal of advanced research, 2016-09, Vol.7 (5), p.597-610 [Peer Reviewed Journal]ISSN: 2090-1232 ;EISSN: 2090-1224 ;DOI: 10.1016/j.jare.2016.06.002 ;PMID: 27408763Full text available |
|
2 |
Material Type: Article
|
Cost Estimates Related to COVID-19 Treatment in Indonesia: What Should be Concerned?E3S web of conferences, 2020-01, Vol.202, p.12012 [Peer Reviewed Journal]ISSN: 2267-1242 ;EISSN: 2267-1242 ;DOI: 10.1051/e3sconf/202020212012Full text available |
|
3 |
Material Type: Article
|
Hydrolytic purification of industrially extracted mimosa tanninJournal of Chromatography Open, 2024-05, Vol.5, p.100136 [Peer Reviewed Journal]EISSN: 2772-3917 ;DOI: 10.1016/j.jcoa.2024.100136Full text available |
|
4 |
Material Type: Article
|
An artificial neural network approach for cost estimation of engineering servicesInternational journal of construction management, 2022-05, Vol.22 (7), p.1274-1287 [Peer Reviewed Journal]2019 The Author(s). Published by Informa UK Limited, trading as Taylor & Francis Group. 2019 ;ISSN: 1562-3599 ;EISSN: 2331-2327 ;DOI: 10.1080/15623599.2019.1692400Digital Resources/Online E-Resources |
|
5 |
Material Type: Article
|
An integrated BIM-based approach for cost estimation in construction projectsEngineering, construction, and architectural management, 2021-11, Vol.28 (9), p.2828-2854 [Peer Reviewed Journal]Emerald Publishing Limited ;Emerald Publishing Limited 2020 ;ISSN: 0969-9988 ;EISSN: 1365-232X ;DOI: 10.1108/ECAM-01-2020-0027Full text available |
|
6 |
Material Type: Conference Proceeding
|
Manufacturing of Low-Cost Bricks Using Waste MaterialsMaterials Proceedings, 2023, Vol.13 (1), p.25 [Peer Reviewed Journal]EISSN: 2673-4605 ;DOI: 10.3390/materproc2023013025Full text available |
|
7 |
Material Type: Article
|
A Hybrid Artificial Bee Colony and Artificial Fish Swarm Algorithms for Software Cost EstimationUHD Journal of Science and Technology, 2024-05, Vol.8 (1), p.129-141 [Peer Reviewed Journal]ISSN: 2521-4209 ;EISSN: 2521-4217 ;DOI: 10.21928/uhdjst.v8n1y2024.pp129-141Full text available |
|
8 |
Material Type: Article
|
Performance assessment of a phengite clay-based flat membrane for microfiltration of real-wastewater from clothes washing: Characterization, cost estimation, and regenerationCase studies in chemical and environmental engineering, 2023-12, Vol.8, p.100388, Article 100388 [Peer Reviewed Journal]2023 The Authors ;ISSN: 2666-0164 ;EISSN: 2666-0164 ;DOI: 10.1016/j.cscee.2023.100388Full text available |
|
9 |
Material Type: Article
|
Fiber Optic Sensing Technologies for Battery Management Systems and Energy Storage ApplicationsSensors (Basel, Switzerland), 2021-02, Vol.21 (4), p.1397 [Peer Reviewed Journal]2021 by the authors. 2021 ;ISSN: 1424-8220 ;EISSN: 1424-8220 ;DOI: 10.3390/s21041397 ;PMID: 33671244Full text available |
|
10 |
Material Type: Article
|
MACHINE LEARNING-BASED REGRESSION MODELS FOR ESTIMATING SEISMIC RETROFIT COST OF MASONRY BUILDINGSمهندسی عمران شریف, 2022-05, Vol.38.2 (1.2), p.27-37 [Peer Reviewed Journal]ISSN: 2676-4768 ;EISSN: 2676-4776 ;DOI: 10.24200/j30.2021.58718.2998Digital Resources/Online E-Resources |
|
11 |
Material Type: Article
|
Climate Change Policy: What Do the Models Tell Us?Journal of economic literature, 2013-09, Vol.51 (3), p.860-872 [Peer Reviewed Journal]Copyright © 2013 American Economic Association ;Copyright American Economic Association Sep 2013 ;ISSN: 0022-0515 ;EISSN: 2328-8175 ;DOI: 10.1257/jel.51.3.860 ;CODEN: JECLB3Full text available |
|
12 |
Material Type: Article
|
Energy and cost analysis of a multiple channel direct contact membrane distillation module: Case studyCase studies in chemical and environmental engineering, 2023-12, Vol.8, p.100449, Article 100449 [Peer Reviewed Journal]ISSN: 2666-0164 ;EISSN: 2666-0164 ;DOI: 10.1016/j.cscee.2023.100449Full text available |
|
13 |
Material Type: Article
|
ANALYSIS OF DAMAGE LEVEL AND COST ESTIMATION OF THE SAMUDRAJAYA 04 BEKASI STATE ELEMENTARY SCHOOL BUILDINGJurnal Pensil, 2022-01, Vol.11 (1), p.47-55 [Peer Reviewed Journal]ISSN: 2301-8437 ;EISSN: 2623-1085 ;DOI: 10.21009/jpensil.v11i1.23405Full text available |
|
14 |
Material Type: Article
|
Agency Conflicts and Cash: Estimates from a Dynamic ModelThe Journal of finance (New York), 2014-10, Vol.69 (5), p.1883-1921 [Peer Reviewed Journal]2014 American Finance Association ;2014 the American Finance Association ;Copyright Blackwell Publishers Inc. Oct 2014 ;ISSN: 0022-1082 ;EISSN: 1540-6261 ;DOI: 10.1111/jofi.12183 ;CODEN: JLFIANFull text available |
|
15 |
Material Type: Article
|
Trafficking Networks and the Mexican Drug WarThe American economic review, 2015-06, Vol.105 (6), p.1738-1779 [Peer Reviewed Journal]Copyright© 2015 American Economic Association ;Copyright American Economic Association Jun 2015 ;ISSN: 0002-8282 ;EISSN: 1944-7981 ;DOI: 10.1257/aer.20121637 ;CODEN: AENRAAFull text available |
|
16 |
Material Type: Article
|
Models to Analyze Risk in Time and Cost Estimation of Tunneling ProjectsGeotechnical and geological engineering, 2024-03, Vol.42 (2), p.1445-1457 [Peer Reviewed Journal]The Author(s) 2023 ;ISSN: 0960-3182 ;ISSN: 1573-1529 ;EISSN: 1573-1529 ;DOI: 10.1007/s10706-023-02627-xDigital Resources/Online E-Resources |
|
17 |
Material Type: Article
|
Exploiting the Essential Assumptions of Analogy-Based Effort EstimationIEEE transactions on software engineering, 2012-03, Vol.38 (2), p.425-438 [Peer Reviewed Journal]Copyright IEEE Computer Society Mar 2012 ;ISSN: 0098-5589 ;EISSN: 1939-3520 ;DOI: 10.1109/TSE.2011.27 ;CODEN: IESEDJFull text available |
|
18 |
Material Type: Article
|
The fit between product market strategy and business model: implications for firm performanceStrategic management journal, 2008-01, Vol.29 (1), p.1-26 [Peer Reviewed Journal]Copyright 2007 John Wiley & Sons, Ltd. ;Copyright © 2007 John Wiley & Sons, Ltd. ;Copyright Wiley Periodicals Inc. Jan 2008 ;ISSN: 0143-2095 ;EISSN: 1097-0266 ;DOI: 10.1002/smj.642 ;CODEN: SMAJD8Full text available |
|
19 |
Material Type: Article
|
A Comprehensive Analysis of BIM Technology's Critical Role in Assessing Cost for Complex Dam Construction ProjectsMathematical Modelling of Engineering Problems, 2023-06, Vol.10 (3), p.767-773ISSN: 2369-0739 ;EISSN: 2369-0747 ;DOI: 10.18280/mmep.100305Full text available |
|
20 |
Material Type: Article
|
The Welfare Effects of Bundling in Multichannel Television MarketsThe American economic review, 2012-04, Vol.102 (2), p.643-685 [Peer Reviewed Journal]Copyright© 2012 The American Economic Association ;Copyright American Economic Association Apr 2012 ;ISSN: 0002-8282 ;EISSN: 1944-7981 ;DOI: 10.1257/aer.102.2.643 ;CODEN: AENRAAFull text available |