skip to main content
Language:
Search Limited to: Search Limited to: Resource type Show Results with: Show Results with: Search type Index

Results 1 - 20 of 21  for All Library Resources

Results 1 2 next page
Refined by: language: Persian remove
Result Number Material Type Add to My Shelf Action Record Details and Options
1
The Effect of Risk Dimensions on the Objectives of Construction Projects in Isfahan Municipality: An Integrated SEM and BBN Analysis
Material Type:
Article
Add to My Research

The Effect of Risk Dimensions on the Objectives of Construction Projects in Isfahan Municipality: An Integrated SEM and BBN Analysis

Mudīriyyat-i bahrahvarī, 2021-09, Vol.15 (3(58)پاییز), p.245-275 [Peer Reviewed Journal]

ISSN: 2716-9979 ;EISSN: 2476-7298 ;DOI: 10.30495/qjopm.2020.575033.2198

Full text available

2
Auto parts supply chain risk assessment and rating models using fuzzy cognitive map and Interpretive Structural Modeling
Material Type:
Article
Add to My Research

Auto parts supply chain risk assessment and rating models using fuzzy cognitive map and Interpretive Structural Modeling

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2022-12, Vol.20 (67), p.121-158 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2022.59120.2617

Full text available

3
Risk Analysis for it Projects Using System Dynamics
Material Type:
Article
Add to My Research

Risk Analysis for it Projects Using System Dynamics

Mudīrīyyat-i tawlīd va ʻamalīyyāt, 2018-04, Vol.9 (1), p.119-137 [Peer Reviewed Journal]

ISSN: 2251-6409 ;EISSN: 2423-6950 ;DOI: 10.22108/jpom.2018.92394.0

Full text available

4
Risk Assessment for Gas Chlorination Units of Water and Wastewater Treatment with FMEA Method
Material Type:
Article
Add to My Research

Risk Assessment for Gas Chlorination Units of Water and Wastewater Treatment with FMEA Method

ʹUlūm va muhandisī-i āb va fāz̤ilāb (Online), 2021-01, Vol.5 (4), p.31-40 [Peer Reviewed Journal]

EISSN: 2588-395X ;DOI: 10.22112/JWWSE.2020.221545.1193

Full text available

5
The sensitivity analysis of main factors of IPC’s cash flow and its comparison to Buy back contracts case study: Darkhowein field
Material Type:
Article
Add to My Research

The sensitivity analysis of main factors of IPC’s cash flow and its comparison to Buy back contracts case study: Darkhowein field

Pizhūhishnāmah-i iqtiṣād-i inirzhī-i Īrān (Online), 2018-12, Vol.8 (29), p.171-193 [Peer Reviewed Journal]

ISSN: 2423-5954 ;EISSN: 2476-6437 ;DOI: 10.22054/jiee.2019.9920

Full text available

6
Consequence modeling of fire on Methane storage tanks in a gas refinery
Material Type:
Article
Add to My Research

Consequence modeling of fire on Methane storage tanks in a gas refinery

Majallah-i muhandisī-i bihdāsht-i ḥirfahʹī = Journal of occupational hygiene engineering, 2016-06, Vol.3 (1) [Peer Reviewed Journal]

ISSN: 2383-3378 ;EISSN: 2383-3378

Full text available

7
Seismic risk analysis and mapping acceleration Nishapur city
Material Type:
Article
Add to My Research

Seismic risk analysis and mapping acceleration Nishapur city

مجله مدل سازی در مهندسی, 2017-09, Vol.15 (50), p.211-223 [Peer Reviewed Journal]

ISSN: 2008-4854 ;EISSN: 2783-2538 ;DOI: 10.22075/jme.2017.2562

Digital Resources/Online E-Resources

8
Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling
Material Type:
Article
Add to My Research

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Salāmat-i kār-i Īrān, 2019-02, Vol.15 (6), p.34-47 [Peer Reviewed Journal]

ISSN: 1735-5133 ;EISSN: 2228-7493

Full text available

9
The crisis of risk analysis in complex socio-technical systems a literature review Part A: Dependency between common risk analysis methods and obsolete accident models
Material Type:
Article
Add to My Research

The crisis of risk analysis in complex socio-technical systems a literature review Part A: Dependency between common risk analysis methods and obsolete accident models

Salāmat-i kār-i Īrān, 2016-10, Vol.13 (4), p.62-76 [Peer Reviewed Journal]

ISSN: 1735-5133 ;EISSN: 2228-7493

Full text available

10
Introducing the Model for Identification and Qualitatively Evaluating Risks of Outsourcing R D Projects (Case Study: Defense R D Projects)
Material Type:
Article
Add to My Research

Introducing the Model for Identification and Qualitatively Evaluating Risks of Outsourcing R D Projects (Case Study: Defense R D Projects)

Bihbūd-i mudīriyyat (Online), 2014-12, Vol.8 (4), p.63-82 [Peer Reviewed Journal]

ISSN: 2251-8991 ;EISSN: 2783-090X

Full text available

11
Risk-Based Analysis for the Production System Performance
Material Type:
Article
Add to My Research

Risk-Based Analysis for the Production System Performance

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2016-03, Vol.14 (40), p.137-163 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2016.3913

Full text available

12
Risk factors for caries development on tooth surfaces adjacent to newly placed class II composites--a pragmatic, practice based study
Material Type:
Article
Add to My Research

Risk factors for caries development on tooth surfaces adjacent to newly placed class II composites--a pragmatic, practice based study

Journal of dentistry, 2015-11, Vol.43 (11), p.1323 [Peer Reviewed Journal]

Copyright © 2015 Elsevier Ltd. All rights reserved. ;EISSN: 1879-176X ;DOI: 10.1016/j.jdent.2015.08.013 ;PMID: 26327559

Digital Resources/Online E-Resources

13
The Effect of Provincial Policies on the COVID-19 Mortality Rate: Risk Analysis Study in Hamadan Province
Material Type:
Article
Add to My Research

The Effect of Provincial Policies on the COVID-19 Mortality Rate: Risk Analysis Study in Hamadan Province

Ṭibb-i junūb, 2022-12, Vol.25 (4), p.340-354 [Peer Reviewed Journal]

ISSN: 1735-6954 ;EISSN: 1735-6954 ;DOI: 10.52547/ismj.25.4.340

Full text available

14
Risk Analysis of Automated Excavation Operations by Energy Trace Barrier Analysis Method
Material Type:
Article
Add to My Research

Risk Analysis of Automated Excavation Operations by Energy Trace Barrier Analysis Method

Salāmat-i kār-i Īrān, 2013-07, Vol.10 (2), p.87-98 [Peer Reviewed Journal]

ISSN: 1735-5133 ;EISSN: 2228-7493

Full text available

15
The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach
Material Type:
Article
Add to My Research

The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach

International journal of engineering (Tehran), 2018-03, Vol.31 (3) [Peer Reviewed Journal]

ISSN: 2423-7167 ;EISSN: 1735-9244 ;DOI: 10.5829/ije.2018.31.03c.04

Full text available

16
Risk Analysis of Urban Settlements against Earthquake Hazard in Lorestan Province
Material Type:
Article
Add to My Research

Risk Analysis of Urban Settlements against Earthquake Hazard in Lorestan Province

Jughrāfiyā va āmāyish-i shahrī manṭaqah/ī (Online), 2014-01, Vol.3 (9), p.1-14 [Peer Reviewed Journal]

ISSN: 2345-2277 ;EISSN: 2783-5278 ;DOI: 10.22111/gaij.2014.1385

Digital Resources/Online E-Resources

17
R‌E‌L‌I‌A‌B‌I‌L‌I‌T‌Y A‌N‌A‌L‌Y‌S‌I‌S O‌F S‌C‌O‌U‌R‌I‌N‌G A‌R‌O‌U‌N‌D T‌H‌E B‌R‌I‌D‌G‌E A‌B‌U‌T‌M‌E‌N‌T‌S
Material Type:
Article
Add to My Research

R‌E‌L‌I‌A‌B‌I‌L‌I‌T‌Y A‌N‌A‌L‌Y‌S‌I‌S O‌F S‌C‌O‌U‌R‌I‌N‌G A‌R‌O‌U‌N‌D T‌H‌E B‌R‌I‌D‌G‌E A‌B‌U‌T‌M‌E‌N‌T‌S

مهندسی عمران شریف, 2018-11, Vol.34.2 (3.2), p.23-31 [Peer Reviewed Journal]

ISSN: 2676-4768 ;EISSN: 2676-4776 ;DOI: 10.24200/j30.2018.1400

Digital Resources/Online E-Resources

18
Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA Technique
Material Type:
Article
Add to My Research

Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA Technique

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2011-12, Vol.9 (23), p.1-19 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X

Digital Resources/Online E-Resources

19
Health, Safety and Environmental Risk Assessment in Laboratory Sites
Material Type:
Article
Add to My Research

Health, Safety and Environmental Risk Assessment in Laboratory Sites

Bihdāsht va īmanī-i kār, 2012-05, Vol.2 (1), p.11-26 [Peer Reviewed Journal]

ISSN: 2251-807X ;EISSN: 2383-2088

Full text available

20
Contract Risk Analysis in Transportation Infrastructure Projects Based on Public-Private Partnership (PPP) Method
Material Type:
Article
Add to My Research

Contract Risk Analysis in Transportation Infrastructure Projects Based on Public-Private Partnership (PPP) Method

پژوهش‌های زیرساخت‌های عمرانی, 2021-08, Vol.7 (1), p.189-210

EISSN: 2783-140X ;DOI: 10.22091/cer.2021.7374.1299

Digital Resources/Online E-Resources

Results 1 - 20 of 21  for All Library Resources

Results 1 2 next page

Personalize your results

  1. Edit

Refine Search Results

Expand My Results

  1.   

Searching Remote Databases, Please Wait