Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Article
|
Auto parts supply chain risk assessment and rating models using fuzzy cognitive map and Interpretive Structural ModelingMuṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2022-12, Vol.20 (67), p.121-158 [Peer Reviewed Journal]ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2022.59120.2617Full text available |
|
2 |
Material Type: Article
|
The crisis of risk analysis in complex socio-technical systems a literature review Part A: Dependency between common risk analysis methods and obsolete accident modelsSalāmat-i kār-i Īrān, 2016-10, Vol.13 (4), p.62-76 [Peer Reviewed Journal]ISSN: 1735-5133 ;EISSN: 2228-7493Full text available |
|
3 |
Material Type: Article
|
Risk-Based Analysis for the Production System PerformanceMuṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2016-03, Vol.14 (40), p.137-163 [Peer Reviewed Journal]ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2016.3913Full text available |
|
4 |
Material Type: Article
|
A Prioritization Model for HSE Risk Assessment Using Combined Failure Mode and Effect Analysis and Fuzzy Inference System: A Case Study in Iranian Construction IndustryInternational journal of engineering (Tehran), 2018-09, Vol.31 (9)ISSN: 2423-7167 ;EISSN: 1735-9244 ;DOI: 10.5829/ije.2018.31.09c.03Full text available |
|
5 |
Material Type: Article
|
The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization ApproachInternational journal of engineering (Tehran), 2018-03, Vol.31 (3) [Peer Reviewed Journal]ISSN: 2423-7167 ;EISSN: 1735-9244 ;DOI: 10.5829/ije.2018.31.03c.04Full text available |
|
6 |
Material Type: Article
|
Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA TechniqueMuṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2011-12, Vol.9 (23), p.1-19 [Peer Reviewed Journal]ISSN: 2251-8029 ;EISSN: 2476-602XDigital Resources/Online E-Resources |