skip to main content
Language:
Search Limited to: Search Limited to: Resource type Show Results with: Show Results with: Search type Index
Show only
Result Number Material Type Add to My Shelf Action Record Details and Options
1
Auto parts supply chain risk assessment and rating models using fuzzy cognitive map and Interpretive Structural Modeling
Material Type:
Article
Add to My Research

Auto parts supply chain risk assessment and rating models using fuzzy cognitive map and Interpretive Structural Modeling

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2022-12, Vol.20 (67), p.121-158 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2022.59120.2617

Full text available

2
The crisis of risk analysis in complex socio-technical systems a literature review Part A: Dependency between common risk analysis methods and obsolete accident models
Material Type:
Article
Add to My Research

The crisis of risk analysis in complex socio-technical systems a literature review Part A: Dependency between common risk analysis methods and obsolete accident models

Salāmat-i kār-i Īrān, 2016-10, Vol.13 (4), p.62-76 [Peer Reviewed Journal]

ISSN: 1735-5133 ;EISSN: 2228-7493

Full text available

3
Risk-Based Analysis for the Production System Performance
Material Type:
Article
Add to My Research

Risk-Based Analysis for the Production System Performance

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2016-03, Vol.14 (40), p.137-163 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X ;DOI: 10.22054/jims.2016.3913

Full text available

4
A Prioritization Model for HSE Risk Assessment Using Combined Failure Mode and Effect Analysis and Fuzzy Inference System: A Case Study in Iranian Construction Industry
Material Type:
Article
Add to My Research

A Prioritization Model for HSE Risk Assessment Using Combined Failure Mode and Effect Analysis and Fuzzy Inference System: A Case Study in Iranian Construction Industry

International journal of engineering (Tehran), 2018-09, Vol.31 (9)

ISSN: 2423-7167 ;EISSN: 1735-9244 ;DOI: 10.5829/ije.2018.31.09c.03

Full text available

5
The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach
Material Type:
Article
Add to My Research

The Integrated Supply Chain of After-sales Services Model: A Multi-objective Scatter Search Optimization Approach

International journal of engineering (Tehran), 2018-03, Vol.31 (3) [Peer Reviewed Journal]

ISSN: 2423-7167 ;EISSN: 1735-9244 ;DOI: 10.5829/ije.2018.31.03c.04

Full text available

6
Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA Technique
Material Type:
Article
Add to My Research

Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA Technique

Muṭāli̒āt-i mudīriyyat-i ṣan̒atī (Online), 2011-12, Vol.9 (23), p.1-19 [Peer Reviewed Journal]

ISSN: 2251-8029 ;EISSN: 2476-602X

Digital Resources/Online E-Resources

Searching Remote Databases, Please Wait