Investigation and Prioritization of Railway Reconstruction Projects by Using Analytic Hierarchy Process Approach Case Study: Kerman and Southeastern Areas in Iranian Railways
Periodica polytechnica. Civil engineering. Bauingenieurwesen, 2022-07, Vol.66 (3), p.671 [Peer Reviewed Journal]Copyright Periodica Polytechnica, Budapest University of Technology and Economics 2022 ;ISSN: 0553-6626 ;EISSN: 1587-3773 ;DOI: 10.3311/PPci.19543
Full text available