skip to main content
Language:
Search Limited to: Search Limited to: Resource type Show Results with: Show Results with: Search type Index

Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects

Sustainability, 2022-08, Vol.14 (15), p.9303 [Peer Reviewed Journal]

2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. ;ISSN: 2071-1050 ;EISSN: 2071-1050 ;DOI: 10.3390/su14159303

Full text available

Citations Cited by
  • Title:
    Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects
  • Author: Alshboul, Odey ; Shehadeh, Ali ; Mamlook, Rabia Emhamed Al ; Almasabha, Ghassan ; Almuflih, Ali Saeed ; Alghamdi, Saleh Y.
  • Subjects: Accuracy ; Algorithms ; Artificial neural networks ; Case studies ; Computer applications ; Construction industry ; Data collection ; Decision trees ; Efficiency ; Empowerment ; Expenditures ; Highway construction ; Learning algorithms ; Machine learning ; Mathematical models ; Neural networks ; Predictions ; Project engineering ; Road construction ; Roads & highways ; Root-mean-square errors ; Subcontractors ; Transportation planning
  • Is Part Of: Sustainability, 2022-08, Vol.14 (15), p.9303
  • Description: Highway construction projects are important for financial and social development in the United States. Such types of construction are usually accompanied by construction delay, causing liquidated damages (LDs) as a contractual provision are vital in construction agreements. Accurate quantification of LDs is essential for contract parties to avoid legal disputes and unfair provisions due to the lack of appropriate documentation. This paper effort sought to develop an ensemble machine learning technique (EMLT) that combines algorithms of the Extreme Gradient Boosting (XGBoost), Categorical Boosting (CatBoost), k-Nearest Neighbor (kNN), Light Gradient Boosting Machine (LightGBM), Artificial Neural Network (ANN), and Decision Tree (DT) for the prediction of LDs in highway construction projects. Key attributes are identified and examined to predict the interrelated correlations among the influential features to develop accurate forecast models to assess the impact of each delay factor. Various machine-learning-based models were developed, where the different modeling outputs were analyzed and compared. Four performance matrices such as Root Mean Square Error (RMSE), Mean Absolute Error (MAE), Mean Absolute Percentage Error (MAPE), and Coefficient of Determination (R2) were used to assess and evaluate the accuracy of the implemented machine learning (ML) algorithms. The prediction outputs implied that the developed EMLT model has shown better performance compared to other ML-based models, where it has the highest accuracy of 0.997, compared to the DT, kNN, CatBoost, XGBoost, LightGBM, and ANN with an accuracy of 0.989, 0.988, 0.986, 0.975, 0.873, and 0.689, respectively. Thus, the findings of this research designate that the EMLT model can be used as an effective administrative decision adding tool for forecasting the LDs. As a result, this paper emphasizes ML’s potential to aid in the advancement of computerization as a comprehensible subject of investigation within highway building projects.
  • Publisher: Basel: MDPI AG
  • Language: English
  • Identifier: ISSN: 2071-1050
    EISSN: 2071-1050
    DOI: 10.3390/su14159303
  • Source: GFMER Free Medical Journals
    Coronavirus Research Database
    ROAD: Directory of Open Access Scholarly Resources
    ProQuest Central

Searching Remote Databases, Please Wait