Evaluation of the method of calculating the planned price of timber harvesting operations
Šumarski list (1945), 2021-12, Vol.145 (11-12), p.515-524
[Peer Reviewed Journal]
ISSN: 0373-1332 ;EISSN: 1846-9140 ;DOI: 10.31298/sl.145.11-12.1
Full text available